Streetlights that measure themselves

The Type 9 model did not look like a headline reform, but it changed how we treat unmetered supply for good.

For the first time, the measurement already built into devices like streetlights can be used directly for settlement. Instead of guessing consumption with estimates, we can actually know it from the data.

I met this rule properly at Gentrack, where I owned the Australian roadmap. Our clients included retailers with unmetered supply customers, from small business up to large commercial and industrial, and distributors too. So I had to work out what Type 9 meant from both sides of the fence.

How were streetlights billed before Type 9?

Most streetlights in the NEM have no meter at all. They are what the rules call a calculated type 7 metering installation. Each type of light is listed in a load table with an assumed wattage, and consumption is worked out from that wattage and the hours the light is expected to be on.

Many lights are grouped under one National Metering Identifier, often one per council. The AEMC notes that the number of lights grouped this way varies a lot between networks and between councils.

The result is a bill based on what a light should use, not what it did use.

Unmetered supply is the corner of energy billing that almost nobody understands. Tracking it is a nightmare. Every network runs its own process, very little of it is written down in one place, and learning it mostly means finding the one person who has done it before.

What is Type 9 metering?

Type 9 is one of three new meter types the AEMC created in its flexible trading rule, made final on 15 August 2024. Type 8A and 8B are for things like EV chargers and batteries at customer premises. Type 9 can only be used at connection points for street lighting and street furniture.

The idea is simple. A smart streetlight already measures its own energy use. Type 9 lets that in-built measurement count for settlement and billing, without installing a separate meter. Many lights can still sit under one identifier, with the data gathered through a central management system.

A few guard rails came with it:

The streetlight arrangements had to be in place by 31 May 2026, ahead of the rest of the flexible trading rule.

Why does it matter for councils?

When the bill is based on an estimate, using less energy does not always show up on it. Payments line up with what was actually used, not a flat estimate. Once that is true, things like smart dimming start to make commercial sense.

The Institute of Public Works Engineering Australasia put it plainly in its submission to the AEMC. Energy savings make up perhaps 45 to 60 percent of the "easily realisable financial benefit" of smart street lighting controls, and the lack of a regime that recognised their metering data had held adoption back.

The AEMC's consultant, Energeia, estimated the change could deliver up to $78 million in benefits over 20 years for smart streetlights. That comes from avoided metering costs, lower maintenance, lower wholesale costs and lower emissions from dimming.

What does it change for retailers and billing systems?

The biggest change is simple to say and hard to build. Billing moves from a calculated load to real interval data. A system that has only ever multiplied a wattage by a number of hours now has to take in measured data, check it and bill from it, for a 'meter' that is really hundreds of lights.

The harder part is what the rule left open. AEMO's procedures set the framework. But the day to day process for switching a group of lights to Type 9 sits with each network. So a platform serving retailers in several states is not building one process. It is building one for every network, and some of those processes did not exist yet when we were scoping the work.

What still needs care?

Moving a group of lights from type 7 to type 9 is not just a switch. AEMO has said it should be done with AEMO to avoid counting the same lights twice, once from the load table and once from the measured data.

There is also the question of what happens when the measurement inside a single light fails. The AEMC says AEMO's procedures will allow some broken measurement components to stay in place for a while, as long as the central system stays accurate.

I am not aware of anyone who has finished the move since the 31 May 2026 start date. But the demand is real. Before I left Gentrack, one network I worked with already had a local council asking for it.

Will it make smart streetlights worth it?

Yes. For years the reason not to invest in smart streetlights was that the savings would never show up on the bill. That excuse is gone. What is left is the hard, boring work of getting every network's process written down and built.

Written by Parag Pandya, a Senior Product Manager in Melbourne with 18 years in Australian energy. Say hello on LinkedIn.